Mcz Flux HYDRO User Manual Page 19

  • Download
  • Add to my manuals
  • Print
  • Page
    / 44
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 18
17
T
I
S
I
U
B
A
P
U
I
I
C
4
3
D
2
I
E
V
U
1
F
2 - INSTALLATION INSTRUCTIONS
Technical Dept. - All rights reserved - Reproduction is prohibited
EXAMPLES OF CORRECT INSTALLATION
1. Installation of Ø150mm ue with hole for the passage
of the tube increased by:
minimum 100 mm around the tube if next to non
ammable parts such as cement, brick, etc.; or
minimum 300 mm around the tube (or as prescribed by
data tags) if next to ammable parts such as wood etc.
In both cases, install suitable insulation between the ue
and the ceiling.
Always check and respect the data tags on the ue,
in particular the minimum safety distances from
combustible materials.
The previous rules also apply for holes made in walls.
2. Old ue, minimum pipe Ø100mm with the inclusion of
an external access door for chimney cleaning.
3. External ue made of insulated stainless steel pipes,
i.e. with double walls minimum Ø100mm: all securely
mounted on the wall. With wind-proof chimney. See g.
7 type A.
4. Ducting system using T joints that allow easy access for
cleaning without having to remove the tubes
FIGURE 11
U = INSULATING
V = ANY REDUCTION FROM 100 TO 80 MM
I = INSPECTION CAP
S = INSPECTION ACCESS PANEL
P = AIR INLET
T = T JOINT WITH INSPECTION CAP
A = MINIMUM 40 MM
B = MAXIMUM 4 M
C = MINIMUM
D = MINIMUM 400 MM
E = HOLE DIAMETER
F = SEE FIG.23456
Page view 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24 ... 43 44

Comments to this Manuals

No comments