Mcz Stub User Manual Page 22

  • Download
  • Add to my manuals
  • Print
  • Page
    / 48
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 21
A
B
20
4-INSTALLATION AND ASSEMBLY
IMPORTANT!
The product must be installed and connected to the product by a qualied technician or competent personnel in
order for all local or national regulations to be complied with and in any case in accordance with UNI 10683.
When the product and the relative frame are unpacked, verify that every part is in perfect working order and no damage has been caused
during transport. If the product is installed in a place that is dicult to access, the weight can be reduced by removing the internal
elements of the rebox. It is recommended to reposition each element correctly.
PREPARATION AND UNPACKING
The product is supplied on pallets with various packaging.
• One contains the structure of Fig. 1.
• A pallet containing the refractory parts, a cardboard box with the sides, a box with the ceramics and a box with the top Fig.2/3.
Open the package and remove the boxes. Once the package is open, remove the two brackets that block the product to the pallet (Fig.4).
Remove the two screws Aand the other three screws B that block the bracket to the pallet and set the product in the pre-selected place,
making sure this complies with the requirements.
FIG.1-STUBSTRUCTUREPACKAGE
FIG.2–PACKAGECONTAININGREFRACTORY
PARTSANDBOXWITHSIDES,CERAMICS
ANDTOP(STUBOVERNIGHT)
FIG.4-REMOVINGTHEPACKAGESCREWS
FIG.3–PACKAGECONTAININGREFRACTORY
PARTSANDBOXWITHSIDES,CERAMICS
ANDTOP(STUB)
Page view 21
1 2 ... 17 18 19 20 21 22 23 24 25 26 27 ... 47 48

Comments to this Manuals

No comments