Mcz Forma Wood 75 Dx User Manual Page 25

  • Download
  • Add to my manuals
  • Print
  • Page
    / 36
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 24
23
5OPERATION
START-UP PRECAUTIONS
Make sure you have read and fully understood the contents of this instruction manual.
Remove all components that could burn from the rebox and door (instructions and various adhesive labels).
Remove the stickers from the ceramic glass otherwise the high temperature could melt them and cause irreparable damage to the glass.
The product can be positioned at an angle or against the wall.
Avoid touching the product during the initial start-up, as the paint completes its drying process and hardens during
this phase. It is good practice to guarantee eective ventilation in the room during the initial start-up, as the
product will emit some smoke and smell of paint, which is absolutely normal!
If necessary, touch up the paint with the spray can of the specic colour.
Do not stand close to the product and air the room. The smoke and smell of paint will disappear after about an hour of operation, however,
remember they are not harmful in any case.
The product will be subject to expansion and contraction during the start-up and cooling phases, therefore light
creaking noises may be heard.
This is absolutely normal as the structure is made of laminated steel and must not be considered a defect.
It is extremely important to make sure the product is not immediately overheated and the temperature increases
gradually.
This will prevent damaging the welds and the steel structure.
Do not expect heating eciency immediately!
OPERATION TEST
ATTENTION !!
BEFORE PERFORMING ANY CLADDING ASSEMBLY OPERATION, CARRY OUT A GENERAL TEST ON THE FIREPLACE
FOLLOWING THE POINTS BELOW:
• Lift and lower the hearth door 7-8 times to check that it slides smoothly and that the counterweights do not cause any noise against
the structure.
• Check that all wiring and the control unit (if one ts the COMFORT AIR VF kit) are distant from the hot body of the closed replace.
• Test at all speeds and ventilation kit modalities (if one ts the COMFORT AIR VF kit).
• Light the re with moderation, to check that the smoke tting has no smoke/soot leaks.
THE MANUFACTURER DECLINES ALL LIABILITY FOR DAMAGE TO THE CLADDING IF THE PREVENTIVE CHECKS ABOVE ARE
NOT CARRIED OUT, RESULTING IN THE DEMOLITION OF THE CLADDING ITSELF TO PERFORM REPAIRS OR ADJUSTMENTS.
STAGES FOR THE FIRST START-UP TEST
• Make sure you have read and fully understood the contents of this instructions manual.
• Remove all components that could burn from the closed replace rebox and door (instructions and various adhesive labels).
• Remove the stickers from the ceramic glass otherwise the high temperature could melt them and cause irreparable damage to the
glass. In this case the manufacturer will not guarantee the glass.
• Open the front combustion air damper completely using the hook supplied.
• Position small sized and thoroughly dry wood (moisture 15/20%). Light the re on moderate power without heating the structure
excessively. Any smells from processing and/or evaporation residues will be emitted the rst few times the replace is lit and will
disappear after it has been used a few times on full power.
Technical Dept. - All rights reserved - Reproduction is prohibited
Page view 24
1 2 ... 20 21 22 23 24 25 26 27 28 29 30 ... 35 36

Comments to this Manuals

No comments